Workover -
Supply
Workover is an operation on a producing well to restore or increase production. Tubing may be pulled out and the casing at the bottom of the well pumped or washed free of accumulated sand. Well bores may be fractured or redrilled, gravel packing may be used, or pumps may be replaced.
Related Links if available:
© OECD/IEA 2009. All rights reserved.
|